Master Transportation Plan
Notice of Study Completion
Appendix D - Environmentally Sensitive Areas
REGIONAL MUNICIPALITY OF HALTON
NOTICE OF COMPLETION
Transportation Master Plan to 2031 - The Road to Change
PR-2414
Background
Halton Region has completed a Transportation Master Plan – The Road to Change to develop a sustainable and integrated transportation plan that considers all modes of travel (automobiles, transit, cycling and walking) to the year 2031. The Transportation Master Plan was conducted in accordance with the master planning process following the requirements of Phases 1 and 2 of the Municipal Class Environmental Assessment process (October 2000, as amended 2007) which is an approved process under the Ontario Environmental Assessment Act.
Process
The Transportation Master Plan provides the Region with the strategies and tools needed to manage traffic safely, effectively, and cost efficiently. This plan offers a range of transportation choices to meet the needs of Halton residents through Active Transportation, Transportation Demand Management and infrastructure related improvements. A key outcome of the study is a list of transportation projects that the Region can incorporate into its 20-year Roads Capital Program.
The Transportation Master Plan incorporates public, local municipal and agency comments received during the course of the study. While the Transportation Master Plan addresses need and justification at the broad level, more detailed studies for Schedule C projects included in the Transportation Master Plan will be completed in subsequent studies as per the Municipal Class Environmental Assessment process. We would like to take the opportunity to thank those members of the Halton community who participated in the Transportation Master Plan project. Your time and input was appreciated. Copies of the Transportation Master Plan document are available for your information at the following locations and on Halton’s website www.halton.ca/htmp.
City of Burlington
Clerk’s Department
426 Brant Street
Burlington, Ontario L7R 3Z6
Tel: 905-335-7600
Mon - Fri: 8:45am – 4:30pm
Town of Halton Hills
Clerk’s Department
1 Halton Hills Drive
Halton Hills, Ontario L7G 5G2
Tel: 905-873-2601
Mon - Fri: 8:30am – 4:30pm
Town of Milton
Clerk’s Department
150 Mary Street
Milton, Ontario L9T 6Z5
Tel: 905-878-7252
Mon - Fri: 8:30am – 4:30pm
Town of Oakville
Clerk’s Department
1225 Trafalgar Road
Oakville, Ontario L6H 0H3
Tel: 905-845-6601
Mon - Fri: 8:30am – 4:30pm
Halton Regional Centre,
Citizen’s Reference Library
1151 Bronte Road
Oakville, Ontario L6M 3L1
Tel: 905-825-6000
Mon - Fri: 8:30am – 4:30pm
Further Information requests or comments can be directed to:
Ms. Melissa Green-Battiston, P. Eng.
Supervisor, Transportation Planning
Halton Region
Phone: 905-825-6000, Ext. 7623
Fax: 905-847-2192
Email: melissa.green-battiston@halton.ca
Please provide all written comments to Halton Region by Monday, November 14, 2011 (within 30 days of this Notice).This Notice issued October 13/14 and October 20/21, 2011.
Showing posts with label Burnhamthorpe. Show all posts
Showing posts with label Burnhamthorpe. Show all posts
Tuesday, November 1, 2011
Tuesday, October 25, 2011
Are we reaching 'peak car'? - Globe and Mail
Are we reaching ‘peak car’?
Oct 22, 2011 – If car culture is on the wane, as some transportation experts suggest, it’s not just because of high unemployment or soaring gas prices, or any ideological campaign. People are simply opting out, writes
Labels:
Burnhamthorpe,
James Snow Parkway
Saturday, July 2, 2011
Thursday, April 7, 2011
Halton Master Transportation Plan
Halton Region proposes a grid style plan for 2031 that will dissect Oakville's last remaining green spaces.
The proposed road network will cut across Sixteen Mile Creek twice (James Snow Parkway and Burnhamthorpe) as well as Bronte Creek.
Link to view: Transportation Master Plan to 2031 - The Road to Change
Send your comments to the consultants preparing the study: Alvaro Almuina, P. Eng at GHD alvaro.almuina AT ghd.com
![]() |
| Halton Master Transportation Plan - proposed road network |
Halton Region proposes a grid style plan for 2031 that will dissect Oakville's last remaining green spaces.
The proposed road network will cut across Sixteen Mile Creek twice (James Snow Parkway and Burnhamthorpe) as well as Bronte Creek.
Link to view: Transportation Master Plan to 2031 - The Road to Change
Send your comments to the consultants preparing the study: Alvaro Almuina, P. Eng at GHD alvaro.almuina AT ghd.com
| Sixteen Mile Creek at Glenorchy |
Labels:
Burnhamthorpe,
James Snow Parkway
Burnhamthorpe Road extension across Sixteen Mile Creek
Help us stop the extension of Burnhamthorpe across Sixteen Mile Creek, through the most intact portion of Oakville’s Natural Heritage System and through the wetlands of Glenorchy Conservation Area
Plans by Halton Region to extend Burnhamthorpe Road will cause great damage to our natural areas in north Oakville. Please let politicians know this is NOT acceptable.
Friends of Glenorchy and OakvilleGreen have been trying to convince politicians to kill this planned new Regional Road but we need your help.
Unless citizens speak up in numbers, politicians will rubber stamp this new four lane road that will destroy large areas of intact forest in Oakville’s Natural Heritage System, cause severe damage to the banks and bed of Sixteen Mile Creek as another crossing is built over it and decimate significant wetlands in the new Glenorchy Conservation Area near Bronte Road.
Please take a moment to send a letter like the one below to the listed politicians.
Dear Chair Carr, Mayors and Councillors:
I'm writing today to express my objection to the planned extension of Burnhamthorpe Road through Glenorchy Conservation Area and the surrounding ANSI (Area of Natural and Scientific Interest).
Another crossing of Sixteen Mile Creek, a 4-lane road through intact forest in Oakville’s NHS and the destruction of a significant portion of Glenorchy Conservation Area is simply unacceptable to the citizens of this community.
It is easy to say we are for protecting the environment and much harder to put it into practice. We expect you to put the environment first in this case and say NO to the Burnhamthorpe extension.
Sincerely,
(Your name and address here)
Send to the Regional Chair and Oakville Mayors and Councillors at these email addys:
gary.carr@halton.ca, mayor@oakville.ca , ward1@oakville.ca, ward1@oakville.ca, ward1@oakville.ca, ward2@oakville.ca, ward3@oakville.ca, ward4@oakville.ca, ward5@oakville.ca, ward6@oakville.ca
Plans by Halton Region to extend Burnhamthorpe Road will cause great damage to our natural areas in north Oakville. Please let politicians know this is NOT acceptable.
Friends of Glenorchy and OakvilleGreen have been trying to convince politicians to kill this planned new Regional Road but we need your help.
Unless citizens speak up in numbers, politicians will rubber stamp this new four lane road that will destroy large areas of intact forest in Oakville’s Natural Heritage System, cause severe damage to the banks and bed of Sixteen Mile Creek as another crossing is built over it and decimate significant wetlands in the new Glenorchy Conservation Area near Bronte Road.
Please take a moment to send a letter like the one below to the listed politicians.
Dear Chair Carr, Mayors and Councillors:
I'm writing today to express my objection to the planned extension of Burnhamthorpe Road through Glenorchy Conservation Area and the surrounding ANSI (Area of Natural and Scientific Interest).
Another crossing of Sixteen Mile Creek, a 4-lane road through intact forest in Oakville’s NHS and the destruction of a significant portion of Glenorchy Conservation Area is simply unacceptable to the citizens of this community.
It is easy to say we are for protecting the environment and much harder to put it into practice. We expect you to put the environment first in this case and say NO to the Burnhamthorpe extension.
Sincerely,
(Your name and address here)
Send to the Regional Chair and Oakville Mayors and Councillors at these email addys:
gary.carr@halton.ca, mayor@oakville.ca , ward1@oakville.ca, ward1@oakville.ca, ward1@oakville.ca, ward2@oakville.ca, ward3@oakville.ca, ward4@oakville.ca, ward5@oakville.ca, ward6@oakville.ca
Thursday, October 21, 2010
Friends of Glenorchy needs support
Friends of Glenorchy needs support
Do you know where Glenorchy is? Close to the great bends in the Sixteen Mile Creek valley as the waters flow from Milton to Oakville is the site of the historic hamlet of Glenorchy.
The recently-formed Glenorchy Conservation Area embraces 400 hectares of environmentally-sensitive lands in this vicinity, stretching roughly from Neyagawa Blvd. to Bronte Rd. The Oakville Natural Heritage System and the Halton NHS afford additional protection here and nearby. We appreciate the efforts of the council members who worked to establish this protection for nature.
Environmental groups fought hard for years to secure connected areas of forest, field and stream so that nature can have a place to prosper in Oakville. Unfortunately the Region of Halton is disregarding these essential connections and planning to slash both Burnhamthorpe Road and the James Snow Parkway through the valley and the conservation area.
We believe in protecting these lands as an intact sanctuary for nature rather than breaking them into fragments with costly and unnecessary roads. We call on council candidates to support nature close to home by opposing the extension of these roads through the majestic Sixteen Mile Creek valley. We call on voters to consider the candidates’ environmental records and platforms carefully and check their responses to the VoteSmart survey (http://environmentaldefence.ca/campaigns/vote-smart) before casting a vote.
– Friends of Glenorchy
http://fog-friendsofglenorchy.blogspot.com/
Do you know where Glenorchy is? Close to the great bends in the Sixteen Mile Creek valley as the waters flow from Milton to Oakville is the site of the historic hamlet of Glenorchy.
The recently-formed Glenorchy Conservation Area embraces 400 hectares of environmentally-sensitive lands in this vicinity, stretching roughly from Neyagawa Blvd. to Bronte Rd. The Oakville Natural Heritage System and the Halton NHS afford additional protection here and nearby. We appreciate the efforts of the council members who worked to establish this protection for nature.
Environmental groups fought hard for years to secure connected areas of forest, field and stream so that nature can have a place to prosper in Oakville. Unfortunately the Region of Halton is disregarding these essential connections and planning to slash both Burnhamthorpe Road and the James Snow Parkway through the valley and the conservation area.
We believe in protecting these lands as an intact sanctuary for nature rather than breaking them into fragments with costly and unnecessary roads. We call on council candidates to support nature close to home by opposing the extension of these roads through the majestic Sixteen Mile Creek valley. We call on voters to consider the candidates’ environmental records and platforms carefully and check their responses to the VoteSmart survey (http://environmentaldefence.ca/campaigns/vote-smart) before casting a vote.
– Friends of Glenorchy
http://fog-friendsofglenorchy.blogspot.com/
Labels:
Burnhamthorpe,
James Snow Parkway
Wednesday, May 5, 2010
New North Oakville Transportation Corridor and Crossing of the Sixteen Mile Creek Class Environmental Assessment Study
NOTICE OF STUDY COMPLETION
CLASS ENVIRONMENTAL ASSESSMENT STUDY
New North Oakville Transportation Corridor and
Crossing of Sixteen Mile Creek
Town of Oakville
PR-2263
Study
Halton Region has completed a Class Environmental Assessment (EA) Study to address future travel demands in North Oakville from Bronte Road (Regional Road 25) to Ninth Line (Regional Road 13) in the Town of Oakville. The study has been conducted in compliance with Schedule C of the Municipal Class Environmental Assessment (October 2000, amended 2007), which is approved under the Ontario Environmental Assessment Act.
Taking into consideration the comments that were received from the Town of Oakville, regulatory agencies and the public, Halton Region is recommending a new alignment for the New North Oakville Transportation Corridor between Bronte Road and Ninth Line which includes the following features:
• A basic right-of-way width of 35 m;
• 4-lane urban roadway comprised of 2 through lanes per direction;
• On-road bike lanes and a 3.0 m multi-use pathway on both sides of the roadway; and
• New bridge crossing of Sixteen Mile Creek.
Process
The Environmental Study Report (ESR) has been prepared to document the planning, public consultation and decision making process undertaken for this study. By this Notice, the ESR is being placed on the public record for a 30-day review period in accordance with the requirements of the Municipal Class EA. Subject to comments
received as a result of this Notice and the receipt of necessary approvals, Halton Region intends to proceed with the detail design and construction of the New North Oakville Transportation Corridor as documented in the ESR.
The ESR is available for review at the following locations:
Clerk’s Department
Regional Municipality of Halton
1151 Bronte Road
Oakville, Ontario
L6M 3L1
Tel: 905-825-6000
Mon.-Fri.: 8:30 a.m. to 4:30 p.m.
Clerk’s Department
Town of Oakville (Town Hall)
1225 Trafalgar Road
Oakville, Ontario
L6J 5A6
Tel: 905-845-6601
Mon.-Fri.: 8:30 a.m. to 4:30 p.m.
Oakville Public Library
White Oaks Branch
1070 McCraney Street East
Oakville, Ontario
L6H 2R6
Tel: 905-815-2038
Sun.: 1:00 p.m. to 5:00 p.m.
Mon. – Thurs: 9:30 a.m. to 8:30 p.m.
Fri. & Sat.: 9:30 a.m. to 5:00 p.m.
Oakville Public Library
Iroquois Ridge Branch
1051 Glenashton Drive
Oakville, Ontario
L6H 6Z4
Tel: 905-338-4247
Sun.: 1:00 p.m. to 5:00 p.m.
Mon. - Thurs.: 9:30 a.m. to 9:00 p.m.
Fri. & Sat.: 9:30 a.m. to 5:00 p.m.
Oakville Public Library
Glen Abbey Branch
1415 Third Line
Oakville, Ontario
L6M 3G2
Tel: 905-815-2039
Sun.: 1:00 p.m. to 5:00 p.m.
Mon. – Thurs.: 9:30 a.m. to 9:00 p.m.
Fri. & Sat.: 9:30 a.m. to 5:00 p.m.
Comments
Further information may be obtained by contacting Ms. Melissa Green-Battiston, Project Manager, Halton Region, 905-825-6000 ext. 7623. Please provide any
written comments to Halton Region by Monday, June 7, 2010 (within 30 days of this Notice). If concerns regarding this project cannot be resolved in discussion with Halton Region, a person or party may request that the Minister of Environment make an order for the project to comply with Part II of the Environmental Assessment Act (referred to as a Part II Order). Requests for a Part II Order must be
received by the Minister, at the address below by Monday, June 7, 2010. A copy of the request must also be sent to the Region’s Project Manager. If no request is
received by Monday, June 7, 2010, Halton Region intends to proceed with detailed design and construction of this project as outlined in the ESR.
Minister of the Environment
135 St. Clair Avenue West
12th Floor
Toronto, Ontario
M4V 1P5
This Notice first issued on May 6, 2010
www.halton.ca/EAprojects
CLASS ENVIRONMENTAL ASSESSMENT STUDY
New North Oakville Transportation Corridor and
Crossing of Sixteen Mile Creek
Town of Oakville
PR-2263
Study
Halton Region has completed a Class Environmental Assessment (EA) Study to address future travel demands in North Oakville from Bronte Road (Regional Road 25) to Ninth Line (Regional Road 13) in the Town of Oakville. The study has been conducted in compliance with Schedule C of the Municipal Class Environmental Assessment (October 2000, amended 2007), which is approved under the Ontario Environmental Assessment Act.
Taking into consideration the comments that were received from the Town of Oakville, regulatory agencies and the public, Halton Region is recommending a new alignment for the New North Oakville Transportation Corridor between Bronte Road and Ninth Line which includes the following features:
• A basic right-of-way width of 35 m;
• 4-lane urban roadway comprised of 2 through lanes per direction;
• On-road bike lanes and a 3.0 m multi-use pathway on both sides of the roadway; and
• New bridge crossing of Sixteen Mile Creek.
Process
The Environmental Study Report (ESR) has been prepared to document the planning, public consultation and decision making process undertaken for this study. By this Notice, the ESR is being placed on the public record for a 30-day review period in accordance with the requirements of the Municipal Class EA. Subject to comments
received as a result of this Notice and the receipt of necessary approvals, Halton Region intends to proceed with the detail design and construction of the New North Oakville Transportation Corridor as documented in the ESR.
The ESR is available for review at the following locations:
Clerk’s Department
Regional Municipality of Halton
1151 Bronte Road
Oakville, Ontario
L6M 3L1
Tel: 905-825-6000
Mon.-Fri.: 8:30 a.m. to 4:30 p.m.
Clerk’s Department
Town of Oakville (Town Hall)
1225 Trafalgar Road
Oakville, Ontario
L6J 5A6
Tel: 905-845-6601
Mon.-Fri.: 8:30 a.m. to 4:30 p.m.
Oakville Public Library
White Oaks Branch
1070 McCraney Street East
Oakville, Ontario
L6H 2R6
Tel: 905-815-2038
Sun.: 1:00 p.m. to 5:00 p.m.
Mon. – Thurs: 9:30 a.m. to 8:30 p.m.
Fri. & Sat.: 9:30 a.m. to 5:00 p.m.
Oakville Public Library
Iroquois Ridge Branch
1051 Glenashton Drive
Oakville, Ontario
L6H 6Z4
Tel: 905-338-4247
Sun.: 1:00 p.m. to 5:00 p.m.
Mon. - Thurs.: 9:30 a.m. to 9:00 p.m.
Fri. & Sat.: 9:30 a.m. to 5:00 p.m.
Oakville Public Library
Glen Abbey Branch
1415 Third Line
Oakville, Ontario
L6M 3G2
Tel: 905-815-2039
Sun.: 1:00 p.m. to 5:00 p.m.
Mon. – Thurs.: 9:30 a.m. to 9:00 p.m.
Fri. & Sat.: 9:30 a.m. to 5:00 p.m.
Comments
Further information may be obtained by contacting Ms. Melissa Green-Battiston, Project Manager, Halton Region, 905-825-6000 ext. 7623. Please provide any
written comments to Halton Region by Monday, June 7, 2010 (within 30 days of this Notice). If concerns regarding this project cannot be resolved in discussion with Halton Region, a person or party may request that the Minister of Environment make an order for the project to comply with Part II of the Environmental Assessment Act (referred to as a Part II Order). Requests for a Part II Order must be
received by the Minister, at the address below by Monday, June 7, 2010. A copy of the request must also be sent to the Region’s Project Manager. If no request is
received by Monday, June 7, 2010, Halton Region intends to proceed with detailed design and construction of this project as outlined in the ESR.
Minister of the Environment
135 St. Clair Avenue West
12th Floor
Toronto, Ontario
M4V 1P5
This Notice first issued on May 6, 2010
www.halton.ca/EAprojects
Tuesday, May 4, 2010
FOG in the news- May 4, 2010
http:///
May 04, 2010 - 11:17 AM |
James Snow extension to Oakville long way off
A new Burhamthorpe Road is a step closer to completion but an extension of James Snow Parkway to Oakville is still a decade away.
Halton Regional council recently voted to release publicly in May an environmental study report recommending the construction over the next decade of a new $208 million arterial road that would cut across the Sixteen Mile Creek valley. The four-lane road, dubbed the north Oakville transportation corridor, is essentially a realigned, widened and extended Burnhamthorpe Road running between Bronte Road in the west to Ninth Line in the east.
An environmental group called The Friends of Glenorchy is protesting the proposed corridor because it would cut through portions of the Glenorchy Conservation Area and cross over the creek valley, a part of Halton’s Natural Heritage System.
The group has also indicated a concern about the Region’s long term plan to extend James Snow Parkway south from Milton to Hwy. 407, where it will meet Neyagawa Bouelvard, because the proposed road extension would cut through the northeast part of Glenorchy.
However, at regional council, Works Commissioner Mitch Zamojc said the James Snow extension isn’t on the Region’s immediate radar.
The project isn’t currently included in Halton’s 10-year capital forecast, Zamojc noted, though he acknowledged staff are reviewing the timing of all roads projects as part of the Region’s ongoing transportation master plan study.
May 04, 2010 - 11:17 AM |
James Snow extension to Oakville long way off
A new Burhamthorpe Road is a step closer to completion but an extension of James Snow Parkway to Oakville is still a decade away.
Halton Regional council recently voted to release publicly in May an environmental study report recommending the construction over the next decade of a new $208 million arterial road that would cut across the Sixteen Mile Creek valley. The four-lane road, dubbed the north Oakville transportation corridor, is essentially a realigned, widened and extended Burnhamthorpe Road running between Bronte Road in the west to Ninth Line in the east.
An environmental group called The Friends of Glenorchy is protesting the proposed corridor because it would cut through portions of the Glenorchy Conservation Area and cross over the creek valley, a part of Halton’s Natural Heritage System.
The group has also indicated a concern about the Region’s long term plan to extend James Snow Parkway south from Milton to Hwy. 407, where it will meet Neyagawa Bouelvard, because the proposed road extension would cut through the northeast part of Glenorchy.
However, at regional council, Works Commissioner Mitch Zamojc said the James Snow extension isn’t on the Region’s immediate radar.
The project isn’t currently included in Halton’s 10-year capital forecast, Zamojc noted, though he acknowledged staff are reviewing the timing of all roads projects as part of the Region’s ongoing transportation master plan study.
Labels:
Burnhamthorpe,
James Snow Parkway
Wednesday, April 28, 2010
Glenorchy is under threat and YOU can help save it!

Plans by Halton Region to extend Burnhamthorpe Road puts significant areas of Glenorchy Conservation Area and the surrounding Areas of Natural and Scientic Interest (ANSI) at risk. It's time to step up and let local politicians know this is NOT acceptable. Speak up and tell your representatives that you care about this issue. Let's make a difference! Keep it Wild!
Here is a sample letter you may choose to use by copying and pasting into an email. Be sure to fill in your name when sending it out:
Hello,
I'm writing today to express my concerns and objections about the plans to extend Burnhamthorpe Road through Glenorchy Conservation Area and the surrounding ANSI (Area of Natural and Scientific Interest). After all the recent celebrations about securing this new green space, it is disheartening to hear that Region staff intend to allow a road to dissect numerous high impact areas and species at risk.
Glenorchy has been declared a Conservation Area and is in an Area of Natural and Scientific Interest (ANSI). Putting in a road sends the wrong message- that people and cars come before nature, that it's okay to carve up sensitive green space and it discourages the use of public transportation. Allowing the building of this road will set a bad precedent and will permanently impact the largest remnants of interior forest and contribute to further habitat fragmentation in the surrounding ANSI.
I hope you will consider these points when it comes to the decision making process.
Sincerely,
(Your name here)
Here is a list of local politicians you can send your email to:
Regional Chair: Gary Carr
E-mail: gary.carr@halton.ca
Bus: 905-825-6115
Oakville
Mayor Rob Burton: oakvillemayor@gmail.com
Ward 1 Regional & Town Councillor Alan Johnston
e-mail: ajohnston@oakville.ca
905-825-9587
Ward 1 Town Councillor Ralph Robinson
e-mail: rrobinson@oakville.ca
tel:905-845-6601, ext. 3700
Ward 2 Regional & Town Councillor Fred Oliver
e-mail: foliver@oakville.ca
tel: 905-849-5669
Ward 2 Town Councillor Cathy Duddeck
e-mail: cduddeck@oakville.ca
tel: 905-845-8374
Ward 3 Regional & Town Councillor Keith Bird
e-mail: kbird@oakville.ca
tel: 905-844-5571
Ward 3 Town Councillor Mary Chapin
email: mchapin@oakville.ca
tel: 905-845-6601 ext. 6008
Ward 4 Regional & Town Councillor Allan Elgar
email: aelgar@oakville.ca
tel: 905-827-6056
Ward 4 Town Councillor Roger Lapworth
e-mail: rlapworth@oakville.ca
tel: 289-837-1346
Ward 5 Regional & Town Councillor Jeff Knoll
e-mail: jknoll@oakville.ca
tel: 905-815-6000
Ward 5 Town Councillor Marc Grant
e-mail: mgrant@oakville.ca
tel: 905-815-6001
Ward 6 Regional & Town Councillor Tom Adams
e-mail: tadams@oakville.ca
tel: 905-849-7915
Ward 6 Town Councillor Max Khan
e-mail: mkhan@oakville.ca
tel: 905-845-6601
Milton
Mayor Gord Krantz: gord.krantz@milton.ca
Local & Regional Councillor Barry Lee Wards 1 and 3
Email: barry@barrylee.ca
Home: 519-824-0679/(For 905 constituents please call 1-888-317-2292)
Local & Regional Councillor Colin Best Wards 2 and 4
Email: colin.best@milton.ca
Home: 905-878-3623
Local Councillor Richard DayWard 1
Email: rick@daylaw.ca
Home: 905-878-3953/Bus: 905-844-8581
Local Councillor Brian Penman Ward 1
Email: BrianPenman@hotmail.com
Home: 905-878-9529
Local Councillor Mike Boughton Ward 2
Email: mikeboughton@sympatico.ca
Cell: 905-691-1990
Local Councillor - Greg Nelson Ward 2
Email: greg.nelson@milton.ca
Phone: 905-864-9860
Local Councillor Cindy Lunau Ward 3
Email: cindy.lunau@milton.ca
Home: 519-853-3772
Local Councillor Jan Mowbray Ward 3
Email: jan@janmowbray.ca
Home: 519-853-4492
Local Councillor Wendy Schau Ward 4
Email: wendy.schau@milton.ca
Home: 905-878-3216
Local Councillor Paul Scherer Ward 4
Email: paul.scherer@milton.ca
Home: 905-876-2214/Cell: 905-691-4288
Provincial Representatives:
Kevin Flynn- MPP
Email: kflynn.mpp.co@liberal.ola.org
Tel: 905-827-5141
Ted Chudleigh- MPP
info@tedchudleigh.com
(905) 691-2222